Member-at-Large Bob Grimm is doing some scenery/trackwork on the narrow gauge section on the east side of the layout. The lower section is now operational because Bob has been restoring operation to existing narrow gauge track and switch machines. The narrow gauge will soon be operational from the dual-gauge lower section to the high line trackage.